TransCore IT241005422 Manual De Usuario
IT2410 Tag Programmer Setup
4-5
5.
Connect the Ethernet cable to the Ethernet connector on the PC. Connect the
other cable end to the Ethernet connector on the tag programmer’s back panel.
other cable end to the Ethernet connector on the tag programmer’s back panel.
6.
Connect the ESD wrist band banana plug to the socket on the tag programmer’s
front panel.
front panel.
Figure 4-2 shows the location of the power and serial interface connectors on the tag
programmer’s back panel.
programmer’s back panel.
Figure 4-2 Power and Serial Interface Connections
Powering Up
When all the equipment is connected as described in the preceding section, apply
power to the system components as follows:
power to the system components as follows:
1.
Switch on the PC and verify its proper operation.
Note: Do not place a tag in the programmer head at this time. The indicator lights
operate differently when a tag is already in place.
operate differently when a tag is already in place.
2.
Switch on the tag programmer’s power switch located on the programmer’s rear
panel. The green POWER LED illuminates.
panel. The green POWER LED illuminates.
Note: The operating system will initiate a self-test upon power up or after power
interruption.
interruption.
When the tag programmer’s internal power-on self-test is successfully completed, the
user is notified as follows:
user is notified as follows:
•
The green READY indicator light illuminates.
•
After approximately 10 seconds, the tag programmer sounds three short tones in
rapid succession.
rapid succession.
If the tag programmer fails to power up, the READY LED goes out, and the ERROR
LED illuminates and the alarm beeps once for one second.
LED illuminates and the alarm beeps once for one second.
The IT2410 unit is now ready to start programming tags.