How to test the PE terminal:
Step 1
 
Connect the test cable to the BENNING IT 110/ BENNING IT 120 B.
Step 2
 Follow the connection diagrams in figures 5.42 and 5.43 to test the PE terminal.
L1
N
PE
reversed phase and 
protection conductors
most dangerous situation
Fig. 5.42: Connection of plug cable and mains outlet  
with reversed L and PE conductors
L1
N
PE
L
PE
N
L/L
1
N/L2
PE/L3
reversed phase and 
protection conductors
most dangerous situation
Fig. 5.43: Connection of universal test cable to load connection  
terminals with reversed L and PE conductors
Step 3 
Touch the PE test probe (TEST key) for a few seconds. If the PE terminal is connected 
to phase voltage, a warning note is displayed and the instrument buzzer activated. 
Warning:
-   If phase voltage is detected on the tested PE terminal, stop all measurements immediately and 
take care that the fault is eliminated before proceeding with any activity.
Note:
-   The PE terminal can only be tested when the function selector switch is set as follows: Z
l/Ik
 (L-
N/ L); Z
s/Ik
 (L/ PE); FI/ RCD TEST. 
-   For correct testing of the PE terminal, the TEST key has to be touched for a few seconds. 
-   Make sure to stand on a non-isolated floor while carrying out the test, otherwise the test result