Parallel UPS shutdown with load transfer on manual bypass (Q2) 
 
The purpose of this procedure is to supply the load directly by mains through manual bypass Q2
 
This procedure is normally performed when the UPS must be completely switched OFF for maintenance 
or service purpose, performed by an authorized Service Center
 
 
 
 
 
1.  Switch OFF the inverter on each unit entering the screen
MENU/COMMAND MENU/INVERTER OFF 
Attention
:  to switch OFF permanently the inverter the key 
Enter must be pressed 2 times
 
COMMAND MENU 
INVERTER ON 
INVERTER OFF *
 
 
 
The output will be supplied by the mains through all automatic 
bypass
.
 
 
LP 33          40kVA  P1 
APPLICAT. ON UTILITY 
= 70% 
 
 
2.  Switch ON the maintenance bypass Q2 (I) on each unit. 
 
LP 33          40kVA  P1 
APPL. ON MANUAL DEV. 
= 70% 
 
 
3.  Switch OFF the output switch Q1 (0) on each unit. 
 
4.  Perform the command total off on each unit. 
 
5.  Remove the battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) on
each unit. 
 
 
 