Empire Comfort Systems DVX36DP71(N,P)-1 Manuale Utente

Pagina di 72
25613-0-0309
Page 10
Framing and Finishing 
1.  Choose unit location.
2.  Frame in fireplace with a header across the top. It is important to 
allow for finished face when setting the depth of the frame.
3.  Attach fireplace to frame using adjustable nailing flange. Preset 
depth to suit facing material (adjustable to 3/8", 1/2" or 3/4" depths). 
Note: Fireplace must mount flush to facing material. If facing 
material  requires  more  depth  than  3/4"  mark  and  drill  two 
(2)  1/8"  holes  into  fireplace  side  at  appropriate  depth.  See 
Figure 10.
4.  Use (8) 1/2" hex-head screws supplied in hardware package, 
to screw through slotted holes in drywall strip and then screw 
into pre-drilled holes on fireplace side. Measure from face of 
fireplace to face of drywall strip to determine final depth. 
Figure 8A
Vent Pipe Clearance
Note:  Maintain one inch (1") of clearance around vertical vent 
pipe. See Figure 9A. For horizontal vent, maintain a minimum 1" 
clearance to the bottom and sides of the vent, and 3" clearance to 
combustibles above the vent pipe. See Figure 9B.
Figure 9A
VENT PIPE
1" MINIMUM CLEARANCE AROUND VENT PIPE
USE OUTER
(4) FLANGES
FOR 1/2”
DRYWALL
Figure 9B
INSTALLATION
2” X 4” STUD
2” X 4” BOTTOM
PLATE
FINISHED WALL
FINISHED SURFACE
(TILE, ETC.)
TOP STANDOFF
Figure 8B