ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
Chapter 4 Installing Cabinet
5. Align installation holes on the base installation assembly with
holes of expansion nuts. Insert the M10 bolt through a big
washer, insulation washer, installation hole of base installation
assembly and insulation washer in turn. Screw down the bolts
and fix the installation assembly on the cement floor, as shown
in
and
F
IGURE
11 BASE INSTALLATION ASSEMBLY (1)
F
IGURE
12 BASE INSTALLATION ASSEMBLY (2)
6. Implement an insulation test.
i.
Adjust the multimeter to the resistance grade.
ii. For resistance measurement, one measuring probe of the
multimeter contacts with the metal part of base assembly
and the other with the expansion nuts. If the circuit dis-
Confidential and Proprietary Information of ZTE CORPORATION
27