ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
Chapter 4 Installing Cabinet
Caution:
Prohibit drilling hole on the cabinet by self. Drilling hole
that does not meet requirements will damage the cables
and cable connection inside the cabinet. The metal dust
caused by drilling will result in short circuit.
iii. Measure whether the cabinet is level with a level bar. If not,
add a levelling sheet under the cabinet to adjust to level.
iv. Open the front door of cabinet and display two circular holes
at the bottom, as shown in
Insert the M10 bolt
through a washer, insulation washer and oval hole, and
screw down the bolt.
F
IGURE
14 FIXING CABINET (2)
1.
Circular Hole
Note:
The insulation washer has been riveted at the bottom of
cabinet.
8. According to Step 6, perform a solution test for metal compo-
nents at the front of cabinet.
9. Close the front door and fix the cabinet, as shown in
Confidential and Proprietary Information of ZTE CORPORATION
29