ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
ZXSDR BS8800 C200 Installation Manual
plays an open status, the insulation test completes. If not,
continue the next.
iii. Check whether the insulation sleeves are damaged or for-
gotten to install. Such as this situation, repeat the above
flow (install the base assembly) and perform an insulation
test again.
7. Fix the cabinet.
i.
Move the cabinet to the front of base assembly and the
back of cabinet faces to the base assembly.
Note:
Considering the weight of cabinet, the top of cabinet pro-
vides lifting eyes and suggest a hoisting installation mode.
ii. Align the location holes at the bottom of cabinet with the
orientation pin bolts on the base assembly, and move the
cabinet slowly and carefully to make two angle supports
inserting the slots at the bottom of cabinet, as shown in
.
F
IGURE
13 FIXING CABINET (1)
1.
Location Hole
2.
Orientation Pin Bolt
3.
Angle Support
28
Confidential and Proprietary Information of ZTE CORPORATION