Kwikbit Inc. PTP55DP Manuale Utente
M4-2000
User Guide
Kwikbit M4-2000 User Guide
Confidential & Proprietary
- 34 -
3. Connect a grounding cable between the ground stud on the backside of the unit and the
supporting structure’s grounding point
4. If out of band management option is desired, connect the management network cable to the
management RJ45 connector port as illustrated below:
5. Connect up to two Ethernet cables to RJ 45 ports 1 (management) and 2 (data)
6. Power can be provided to the unit through ports 1 (management) or 2 (data plane). A PoE
6. Power can be provided to the unit through ports 1 (management) or 2 (data plane). A PoE
injector needs to be installed in-line with the Management or Data network cables
connected to one of these ports as shown. Make sure that the length of the Ethernet cable
connected to one of these ports as shown. Make sure that the length of the Ethernet cable
between the unit and the injection point does not exceed 30 meters.
5.1.6 Aligning Link Antenna
Before performing the units’ antenna alignment for optimal link performance, make sure you have
completed the physical installation procedure for the units on both sides of the link. If the pre-
configuration tasks were not performed prior to physical installation of the units, perform the pre-
configuration tasks were not performed prior to physical installation of the units, perform the pre-
configuration tasks before proceeding with the alignment procedure.
1. Power up the units on both sides of the link. The PWR indicator light on both units should
be illuminated green. The primary unit will begin broadcasting signal and the secondary
unit will enter receiving mode, attempting to obtain signal. The main page on the web
unit will enter receiving mode, attempting to obtain signal. The main page on the web
management interface will reflect this state and the LNK indicator light on the unit will start
blinking green. Once the radio link and data connection is established, the LNK light
blinking green. Once the radio link and data connection is established, the LNK light
becomes continuously lit. Observe the LEDs to determine initial connectivity between the
units when performing next steps. Table 3.4.5 details the states indicated by LED activity.
units when performing next steps. Table 3.4.5 details the states indicated by LED activity.
2. At each side of the link adjust the units to point towards the unit at the other side of the link.
Use a compass or other tool to perform this task
RJ45 GigE Port 2
(Data, PoE)
RJ45 GigE Port 1
(Management, PoE)
RJ45 GigE Port 3
(Data)