Kwikbit Inc. PTP55DP Manuale Utente
M4-2000
User Guide
Kwikbit M4-2000 User Guide
Confidential & Proprietary
- 36 -
5.3 Verifying link performance
After the system has been installed and configured, check its performance to verify that it is
achieving predicted levels. Open a browser window, connect and login to one of the units of a link.
achieving predicted levels. Open a browser window, connect and login to one of the units of a link.
The Main page provides summary of performance status of radio 1 and radio 2 as illustrated below:
Verify that Radio 1 and Radio 2 are in a “link-up” state and that the Link Status displays
“Connected”.
For both Uplink and Downlink, note the MCS levels, horizontal (H) and vertical (V), for each radio.
Based on these MCS levels, the maximum achievable data rate in each direction is listed in the
“Connected”.
For both Uplink and Downlink, note the MCS levels, horizontal (H) and vertical (V), for each radio.
Based on these MCS levels, the maximum achievable data rate in each direction is listed in the
throughput section at the bottom of the page.
If the header compression feature is enabled, the throughput can be higher than the capacity and
If the header compression feature is enabled, the throughput can be higher than the capacity and
the utilization can exceed 100%. Refer to tables in section 3.5.4 for expected throughput
enhancement due to header compression based on different average packet sizes.
Verify that RSL and CINR values on both local and remote units are at the optimal levels for
achieving the highest possible MCS level.
enhancement due to header compression based on different average packet sizes.
Verify that RSL and CINR values on both local and remote units are at the optimal levels for
achieving the highest possible MCS level.