TABLE 2
Model
Heater kW
Power Cord Kit
Voltage
Amperage
Receptacle
PDE07K
0.0
PXPC23000
230/208
15
NEMA 6-15r
PDE/PDH07K
2.0
PXPC23015
230/208
15
NEMA 6-15r
3.0
STD
230/208
20
NEMA 6-20r
PDE09K
0.0
PXPC23000
230/208
15
NEMA 6-15r
PDE/PDH09K
2.0
PXPC23015
230/208
15
NEMA 6-15r
3.0
STD
230/208
20
NEMA 6-20r
5.0
PXPC23030
230/208
30
NEMA 6-30r
PDE12K
0.0
PXPC23000
230/208
15
NEMA 6-15r
PDE/PDH12K
2.0
PXPC23015
230/208
15
NEMA 6-15r
3.0
STD
230/208
20
NEMA 6-20r
5.0
PXPC23030
230/208
30
NEMA 6-30r
PDE15K
0.0
PXPC23000
230/208
15
NEMA 6-15r
PDE/PDH15K
2.0
PXPC23015
230/208
15
NEMA 6-15r
3.0
PXPC23020
230/208
20
NEMA 6-20r
5.0
STD
230/208
30
NEMA 6-30r
PDE/PDH07R
2.0
PXPC26515
265
15
NEMA 6-15r
3.0
STD
265
20
NEMA 6-20r
PDE/PDH09R
2.0
PXPC26515
265
15
NEMA 6-15r
3.0
STD
265
20
NEMA 6-20r
5.0
PXPC26530
265
30
NEMA 6-30r
PDE/PDH12R
2.0
PXPC26515
265
15
NEMA 6-15r
3.0
STD
265
20
NEMA 6-20r
5.0
PXPC26530
265
30
NEMA 6-30r
PDE/PDH15R
2.0
PXPC26515
265
15
NEMA 6-15r
3.0
PXPC26520
265
20
NEMA 6-20r
5.0
STD
265
30
NEMA 6-30r
Electrical Wiring for 265 Volt
Models
NOTE:
It is recommended that the PXSB subbase assembly, the
PXCJA conduit kit (or equivalent) be installed on all hardwire
units. If installing a flush-floor mounted unit, make sure the
chassis can be removed from the sleeve for service and
maintenance.
WARNING
Electrical Shock Hazard
Turn off electrical power before service
or installation.
ALL electrical connections and wiring
MUST be installed by a qualified
electrician and conform to the National
Code and all local codes which have
jurisdiction.
Failure to do so can result in property
damage, personal injury and/or death.
Power Cord Installation
All 265V PTAC/PTHP units come with a factory installed non-LCDI
power cord for use in a subbase. If the unit is to be hard-wired refer to
the instructions below.
To install the line voltage power leads and conduit
to chassis, follow the instructions below and refer
to Figures 25-27 on page 19. PXCJA Conduit Kit
is required with this setup.
1. Follow the removal process of the chassis’s junction box
(Figure 25, step 2, page 19).
2. Prepare the 265V (or 230V) power cord for connection to the chas-
sis’ power cord connector by cutting the cord to the appropriate
length (refer to Figure 26 and follow Figure 15). Power cord harness
selection shown on Table 2 on page 14.