PERMIT  OPERATION  OF  GAS APPLIANCES  IF  INSTALLED  
18  INCHES  OR  MORE  ABOVE  THE  FLOOR.  THIS  MAY  
REDUCE THE RISK IF LOCATION IN SUCH AN AREA CANNOT 
BE AVOIDED.
 WARNING
FLAMMABLE ITEMS, PRESSURIZED CONTAINERS OR ANY 
OTHER  POTENTIAL  FIRE  HAZARDOUS ARTICLES  MUST 
NEVER BE PLACED ON OR ADJACENT TO THE BOILER. 
OPEN  CONTAINERS  OF  FLAMMABLE  MATERIAL  MUST 
NOT  BE  STORED  OR  USED  IN  THE  SAME  ROOM  WITH 
THE BOILER.
A hot water boiler installed above radiation level or as required 
by the authority having jurisdiction, must be provided with a low 
water cutoff device at the time of boiler installation.
AIR REQUIREMENTS
Provisions  for  combustion  and  ventilation  air  in  accordance  
w i t h   t h e   c u r r e n t   e d i t i o n   o f   t h e   N a t i o n a l   F u e l   G a s 
Code,  ANSI  Z223.1,  CAN/CSA  B149.1,  Installation 
C o d e s ,   o r   a p p l i c a b l e   p r o v i s i o n s   o f   t h e   l o c a l  
building codes.
Provisions for vent, bleed and gas relief lines (when applicable).
Keep appliance area free of combustible or flammable liquids.
Do not obstruct the flow of combustion or ventilating air.
 WARNING
FOR  SAFE  OPERATION  PROVIDE  ADEQUATE  AIR  FOR 
COMBUSTION AND VENTILATION. AN INSUFFICIENT SUPPLY 
OF AIR  WILL  CAUSE  RECIRCULATION  OF  COMBUSTION 
PRODUCTS  RESULTING  IN  AIR  CONTAMINATION  THAT 
MAY BE HAZARDOUS TO LIFE. SUCH A CONDITION OFTEN 
WILL  RESULT  IN A  YELLOW,  LUMINOUS  BURNER  FLAME, 
CAUSING CARBONING OR SOOTING OF THE COMBUSTION 
CHAMBER,  BURNERS AND  FLUE  TUBES AND  CREATES A 
RISK OF ASPHYXIATION.
Unconfined Space
In  buildings  of  conventional  frame,  brick  or  stone  construction, 
unconfined spaces may provide adequate air for combustion, and 
draft hood dilution.
If the unconfined space is within a building of tight construction 
(buildings using the following construction: weather stripping, 
heavy insulation, caulking, vapor barrier, etc.) air for combustion, 
ventilation,  and  draft  hood  dilution  must  be  obtained  from 
outdoors or spaces freely communicating with the outdoors. The 
installation instructions for confined spaces in tightly constructed 
buildings must be followed to ensure adequate air supply.
Confined Space
(a)  U. S. Installations
When drawing combustion and dilution air from inside a conventionally 
constructed building to a confined space, such a space shall be 
provided with two permanent openings, ONE  WITHIN 12 INCHES 
OF THE ENCLOSURE TOP AND ONE WITHIN 12 INCHES OF THE 
ENCLOSURE BOTTOM. Each opening shall have a free area of at 
least one square inch per 1000 Btuh of the total input of all appliances 
in the enclosure, but not less than 100 square inches. 
If the confined space is within a building of tight construction, 
air for combustion, ventilation, and draft hood dilution must be 
obtained from outdoors. When directly communicating with the 
outdoors or communicating with the outdoors through vertical 
ducts, two permanent openings, located in the above manner, 
shall be provided. Each opening shall have a free area of not 
less than one square inch per 4000 Btuh of the total input of 
all appliances in the enclosure. If horizontal ducts are used, 
each  opening  shall  have  a  free  area  of  not  less  than  one 
square inch per 2000 Btuh of the total input of all appliances 
in the enclosure.
(b)  Canadian Installations
Ventilation  of  the  space  occupied  by  the  boiler(s)  shall  be 
provided by an opening for ventilation air at the highest practical 
point  communicating  with  outdoors. The  total  cross-sectional 
area  shall  be  at  least  10%  of  the  area  of  the  combustion  air 
opening but in no case shall the cross-sectional area be less 
than 10 square inches (6500 mm
2
).
In additional to the above, there shall be permanent air supply 
opening(s)  having  a  cross-sectional  area  of  not  less  than  1 
square inch per 7,000 BTUH (310 mm
2
/KW) up to and including  
1,000,000 BTUH plus 1 square inch per 14,000 BTU in excess 
of  1,000,000  BTUH.  This  opening(s)  shall  be  located  at,  or 
ducted  to,  a  point  neither  more  than  18"  (450  mm)  nor  less 
than 6 inches (150 mm) above the floor level.
Where power vented equipment is used in the same room as the 
boiler, sufficient air openings must be supplied.
UNDERSIZED OPENINGS MAY RESULT IN INSUFFICIENT AIR 
FOR COMBUSTION.
WHERE AN EXHAUST FAN IS INSTALLED IN THE SAME ROOM 
WITH A BOILER, SUFFICIENT OPENINGS FOR AIR MUST BE 
PROVIDED IN THE WALLS.
UNDERSIZED  OPENINGS  WILL  CAUSE AIR  TO  BE  DRAWN 
INTO THE ROOM THROUGH THE CHIMNEY, CAUSING POOR 
COMBUSTION. SOOTING MAY RESULT WITH AN INCREASED 
RISK O F ASPHYXIATION.
CHEMICAL VAPOR CORROSION
 WARNING
CORROSION OF THE FLUEWAYS AND VENT SYSTEM 
MAY  OCCUR  IF  AIR  FOR  COMBUSTION  CONTAINS 
C E R T A I N   C H E M I C A L   V A P O R S   W H I C H   B R E A K 
DOWN  INTO  ACIDS  AT  HIGH  TEMPERATURE.  SUCH 
CORROSION MAY RESULT IN FAILURE AND RISK OF 
ASPHYXIATION.
Water boiler corrosion and component failure can be caused 
by the heating and breakdown of airborne chemical vapors. 
Spray can propellants, cleaning solvents, refrigerator and air 
conditioning refrigerants, swimming pool chemicals, calcium 
and sodium chloride, waxes, and process chemicals are typical 
compounds which are corrosive. These materials are corrosive 
at very low concentration levels with little or no odor to reveal 
their presence. Products of this sort must not be stored near 
the boiler. Also, air which is brought in contact with the water 
boiler should not contain any of these chemicals. If necessary, 
uncontaminated air should be obtained from remote or outside 
sources.