HP ProLiant ML330 G6 ユーザーズマニュアル

ページ / 129
 
Hardware options installation 52 
3. 
Install the hard drive. 
 
4. 
Determine the status of the drive by observing the drive LEDs ("
5. 
Resume normal server operations. 
 
Expansion hard drive cage option (hot-plug) 
To install the component: 
1. 
Power down the server (on page 
2. 
Do one of the following: 
Open or remove the tower bezel, as needed ("
). 
Extend the server from the rack (on page 
3. 
Remove the access panel (on page 
). 
4.