Cisco Cisco ONS 15600 SDH Multiservice Provisioning Platform (MSPP) Guia Da Instalação

Página de 26
 
8
Upgrading the Cisco ONS 15600 SDH to Release 9.0
78-18839-01
DLP-  U441 Perform an MS-SPRing Lockout
Step 12
Complete the 
 for all MS-SPRing nodes 
in the network.
Step 13
(Optional) Use this step only if you wish to ensure that a software revert to the previous software release 
is no longer possible. Complete the 
 again for all nodes, or groups of nodes you are upgrading. 
Step 14
Complete the 
 for any nodes that are not using 
Simple Network Time Protocol (SNTP).
Step 15
As needed, upgrade any spare TSC cards by installing the spare in the standby slot.
Caution
When you insert a spare TSC card in the standby slot, a software mismatch alarm is raised. The working 
software on the active TSC card is then copied to the standby TSC, causing the standby TSC card to reset. 
When the standby TSC card reset completes, the standby TSC is running the same software version as 
the active TSC card.
Note
You can activate only one node at a time; however, you can begin activation of the next node as soon as 
the TSC cards for the current node have rebooted successfully (wait 5 minutes from the time the 
SYSBOOT alarm is raised).
Step 16
Backup the Software R8.0 database, using the 
, and substituting Software R9.0 for Software R8.0.
Stop. You have completed this procedure.
Step 17
Return to your originating procedure (NTP).
DLP-U441 Perform an MS-SPRing Lockout
Note
During activation, MS-SPRing spans are not protected. You must leave the MS-SPRing in the lockout 
state until you have finished activating all nodes in the ring, but you must be sure to remove the lockout 
after you have finished activating.
Purpose
If you have an MS-SPRing provisioned, before beginning the upgrade you 
must perform a span lockout at each node in the ring.
The database must be backed up prior to locking the MS-SPRing.
Tools/Equipment
PC or UNIX workstation, Software R9.0 files
Prerequisite Procedures
(MS-SPRing nodes only) The database must be backed up prior to locking 
the ring.
Required/As Needed
Required for MS-SPRing only
Onsite/Remote
Onsite or remote (but in the presence of the workstation)
Security Level
Maintenance and above