Cisco Cisco FastHub 412M 10 100 Repeater

Página de 10
 5
Installing a Module
Installing a Module
You can install either switched uplink module in the expansion slot on the rear panel of the hub.
Warning
Class 1 laser product.
Warning
Avoid exposure to the laser beam.
Caution
 When installing a 100BaseFX switched uplink module, do not remove the rubber plugs from the 
fiber-optic port or the rubber caps from the fiber-optic cable until you are ready to connect the cable. The 
plugs and caps protect the fiber-optic port and cable from contamination. 
Caution
The modules are not hot-swappable. Be sure to power off the hub before installing a module in the 
hub or removing it.
To install a module, follow these steps:
Step 1
Power off the hub.
Step 2
Remove and set aside the screws attaching the faceplate to the expansion slot. The screws 
will be used later in Step 6.
Step 3
Remove the faceplate and store it for future use.
Step 4
Slide the module into the slot card-guides until you feel it touch the back of the hub.
Step 5
Push the module firmly until it snaps into place and is firmly seated. Figure 3 shows 
a 10/100 switch module being installed. 
Figure 3
Installing a Module
Step 6
Insert and tighten the screws on the module faceplate.
Step 7
Power on the hub.
Step 8
Connect the module port to a device as described in the “Connecting to the Module Port” 
section on page 6
.
RATING
100-127 / 200-240 V~
2A /1A   50 / 60 Hz
CONSOLE
UP
MEDIA MODULE
DOWN
DC INPUT
DC INPUTS FOR REMOTE
POWER SUPPLY
SPECIFIED IN MANUAL
+5V     
@
6A, +12V     
@
1A
10/100 BASE-TX
STAT DUP 100
15224