Tyco SafeLINC 4100U Manual Do Utilizador
7-1
This chapter shows how various devices are wired to an SPS. It includes connection to
NACs, IDNet, relays, and power circuits.
NACs, IDNet, relays, and power circuits.
Refer to the page number listed in this table for information on a specific topic.
Topic
See Page #
Chapter 7
SPS Field Wiring (4100U)
Introduction
In this Chapter