Monogram ZV800SJSS Instrução De Instalação

Página de 24
14
Installation Instructions
DUCTWORK, WIRING LOCATIONS
• Determine the exact location of the vent hood.
• Locate the template packed with the literature.
• Measure 36” from the floor to the top of the cooking 
surface. Add hood installation height determined on 
page 7. Mark that location.
• Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
• Use a level to draw a line straight up, from the centerline
on the template to the ceiling.
HOUSE WIRING LOCATION:
• The junction box is located on the top right side of the
hood.
• Wiring should enter the back wall 20” to 26” above the
bottom of the hood, and within 4” of the right side of the
centerline.
REAR WALL TEMPLATE
C
L
49-80271    JR 07-04
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
ALIGN BOTTOM EDGE WITH  
PENCIL LINE INDICATING  
BOTTOM OF THE HOOD.
5-1/16"
9-5/8"
8-1/8"
2-1/16"
13-3/4"
12-3/4"
Ceiling
WALL-MOUNTED INSTALLATION—RECIRCULATING
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: 
Framing must be capable of
supporting 100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
• Cut away enough drywall to expose 2 vertical studs at
the bracket location indicated on the template.
• Install a horizontal support at least 1” x 6” between 
two wall studs at the top bracket installation location.
The horizontal support must be flush with the room
side of the studs. 
Use cleats behind both sides of the
support to secure to wall studs.
• Reinstall drywall.
1
Centerline of 
Installation
Space
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
Centerline of
installation
space
View from rear
cleats
1” x 6” min.
mounting 
support