Monogram ZTD910SFSS Instrução De Instalação
7
Installation Preparation
2x2 or 2x4 Anti-Tip
Block Against Rear
Block Against Rear
Wall, 9" From Floor
to Bottom of Block
2x2 or 2x4 Anti-Tip
Block Against Rear
Block Against Rear
Wall, 9" From Floor
to Bottom of Block
1" Min. Above Toekick or Adjust
to Oven Installation Height
to Oven Installation Height
1" Min. Above Toekick
Allow 5/8"
Overlap on
Overlap on
All Sides
23-1/2" Min.
Inside
23-1/2" Min.
Inside
Oven
Cutout
Oven
Cutout
2" Min.
2" Min.
9"
9"
A
A
B
B
9-1/4"
9-1/4"
23-1/4"
23-1/4"
10-1/2"
10-1/2"
Allow 5/8"
Overlap on
Overlap on
All Sides
NOTE: Additional clearance between cutouts may
be required. Check to be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2" depth and 9-1/4" height.
be required. Check to be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2" depth and 9-1/4" height.
NOTE: Additional clearance between cutouts may
be required. Check to be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2" depth and 9-1/4" height.
be required. Check to be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2" depth and 9-1/4" height.
INSTALLATION OPTIONS
Dimensions
A B
ZTD910
28-1/2"
30"
ZKD910
25-1/2"
26-3/4"
When installed under a wall oven:
Warming drawers are approved for installation below only
certain specified wall oven models. See the label attached
to the top of the warming drawer for approved models.
• When installed, the front face of the drawer
certain specified wall oven models. See the label attached
to the top of the warming drawer for approved models.
• When installed, the front face of the drawer
will be nearly flush with adjacent cabinetry doors.
• Drawer overlaps will conceal cut edges
on all sides of the opening.
The rough opening for the drawer must be:
– Depth: 23-1/2" min. from inside back to front
of cabinet frame.
– Width: 25-1/2" for 27" wide models,
28-1/2" for 30" wide models.
– Height: 9-1/4".
– Allow 2" min. between oven and drawer cutouts
– Allow 2" min. between oven and drawer cutouts
for clearance of overlaps.
NOTE: If you are installing in frameless cabinets, it may
be necessary to install 1/2" wide cleats to accept drawer
mounting screws. See drawer for mounting screw locations.
be necessary to install 1/2" wide cleats to accept drawer
mounting screws. See drawer for mounting screw locations.
Installation Below
a Single Oven
Installation Below
a Double Oven