Monogram ZTD910SFSS Instrução De Instalação

Página de 16
7
Installation Preparation
2x2 or 2x4 Anti-Tip
Block Against Rear
Wall, 9" From Floor
to Bottom of Block
2x2 or 2x4 Anti-Tip
Block Against Rear
Wall, 9" From Floor
to Bottom of Block
1" Min. Above Toekick or Adjust
to Oven Installation Height
1" Min. Above Toekick
Allow 5/8"
Overlap on
All Sides
23-1/2" Min.
Inside
23-1/2" Min.
Inside
Oven
Cutout
Oven
Cutout
2" Min.
2" Min.
9"
9"
A
A
B
B
9-1/4"
9-1/4"
23-1/4"
23-1/4"
10-1/2"
10-1/2"
Allow 5/8"
Overlap on
All Sides
NOTE: Additional clearance between cutouts may 
be required. Check to be sure that oven supports 
above the Warming Drawer location does not obstruct 
the required interior 23-1/2" depth and 9-1/4" height.
NOTE: Additional clearance between cutouts may 
be required. Check to be sure that oven supports 
above the Warming Drawer location does not obstruct 
the required interior 23-1/2" depth and 9-1/4" height.
INSTALLATION OPTIONS
Dimensions
A B
ZTD910
28-1/2"
30"
ZKD910
25-1/2"
26-3/4"
When installed under a wall oven: 
Warming drawers are approved for installation below only
certain specified wall oven models. See the label attached 
to the top of the warming drawer for approved models. 
• When installed, the front face of the drawer 
will be nearly flush with adjacent cabinetry doors.
• Drawer overlaps will conceal cut edges 
on all sides of the opening.
The rough opening for the drawer must be:
– Depth: 23-1/2" min. from inside back to front 
of cabinet frame.
– Width: 25-1/2" for 27" wide models, 
28-1/2" for 30" wide models.
– Height: 9-1/4".
–  Allow 2" min. between oven and drawer cutouts 
for clearance of overlaps.
NOTE: If you are installing in frameless cabinets, it may 
be necessary to install 1/2" wide cleats to accept drawer
mounting screws. See drawer for mounting screw locations.
Installation Below
a Single Oven
Installation Below
a Double Oven