Справочник Пользователя для State Industries GP6 50 HTPDT 120 Series

Скачать
Страница из 60
26
vertIcal vent terMInal InstallatIon
when  terMInatInG  throuGh a  roof,  the  followInG 
specIfIcatIons  pertaInInG  to  terMInal  locatIon 
Must be followed.
1.  Proper support must be provided for all pipe protruding through 
the roof.
2.  The vertical roof terminations should be sealed with a plumbing 
roof boot or equivalent flashing.
3.  The intake vent termination and the exhaust vent termination 
must penetrate the same side of roof.
4.  The  center  line  of  the  intake  vent  termination  and  the  center 
line of the exhaust vent termination must be no closer than 24” 
(61cm).
The specifications are displayed in Figures 17 and 18.
NOTE: Exhaust vent terminal is installed using the same procedure.
flat roof InstallatIon
On flat roof installations the intake air and the vent terminations must 
be a minimum of 24 inches (60 cm) above any parapet, vertical wall 
or structure within 10 feet (3 m) horizontally. See figure 19.
fIGure 17.
fIGure 18.
INTAKE AIR AND/OR VENT
TERMINATION(S) MUST BE A 
MINIMUM OF 24 INCES (60 cm) 
ABOVE ANY PARAPET, VERTICAL
WALL OR STRUCTURE WITHIN
10 FEET (3 m) HORIZONTALLY.
VERTICAL TERMINATION(S) FLAT ROOF CLEARANCE
INTAKE AIR AND/OR VENT (EXHAUST)
24 INCHES (60 cm)
MINIMUM HEIGHT ABOVE
IF LESS THAN
10 FEET (3 m)
NOTE:
INTAKE VENT
TERMINATION
SHOWN HERE
fIGure 19.