Справочник ПользователяСодержаниеtable of contents2Applicators31safe installation, use and service3Controls and Switches33APPROVALS3Blower Prover Switch33general safety information4Blocked Exhaust Switch33Precautions4Blocked Intake Switch33Grounding Instructions4On/Off Switch33Hydrogen Gas Flammable4Hot Surface Igniter33troubleshooting6temperature regulation36introduction7Hi Limit Switch (E.C.O.)36Abbreviations Used7control system operation37Qualifications7Overview37Qualified Installer or Service Agency7Commercial And Residential Models37iCOMM™ & BACnet Compatible7Control System Navigation37Preparing For The Installation7User Input Buttons37features and components8The Desktop Screen37installation consideration9Status Icons38Rough in Dimensions9Operating States39Locating The Water Heater10Control System Menus39Insulation Blankets11User Settings & Control System Menus40Combustion Air and Ventilation11Temperatures40Unconfined Space11Operating Set Point And Differential Adjustment40Unusually Tight Construction12Temperatures (cont)41Confined Space12Heater Status41Direct Vent Appliances12Display Settings42Exhaust Fans12Heater Information42Louvers and Grilles12Current Fault43Fresh Air Openings For Confined Spaces12Fault History43Outdoor Air Through Two Openings12Fault Occurrence43Outdoor Air Through One Opening12Restore Factory Defaults43Outdoor Air Through Two Horizontal Ducts13Service Contact Information44Air From Other Indoor Spaces13for your information45installing the new water heater14Start Up Conditions45Chemical Vapor Corrosion14Smoke/Odor45Water Piping14Thermal Expansion45Power Supply14Operational Conditions45Power Fluctuations and Electrical Noise14Smelly Water45Dedicated Power Wiring and Breakers14“Air” in Hot Water Faucet45Polarity Sensitive14periodic maintenance46Mixing Valves15Venting System Inspection46Dishwashing Machines15Anode Rod Inspection46Space Heating and Potable Water System15Temperature-Pressure Relief Valve Operation46Closed Water Systems15Draining and Flushing46Thermal Expansion16To Drain the Water Heater Storage Tank47Temperature-Pressure Relief Valve17To Flush the Water Heater Storage Tank47T&P Valve Discharge Pipe Requirements:17Service47Gas Piping18maintenance48Condensate Piping18Temperature-Pressure Relief Valve Test48High Altitude Installations19leakage checkpoints49Sediment Traps19troubleshooting50Filling the Water Heater19Installation Checklist50Venting20Water Heater Location50Vent Pipe Termination20Venting50Planning the Vent System20Gas Supply and Piping50Installation of Vent System21Condensate Drain50Vent Terminal Installation, Sidewall21Electrical Connections50Installation Requirements - Commonwealth of Massachusetts22Sequence Of Operation Flow Chart51Termination Clearances Sidewall Power Vent23Operational Problems52Termination Clearances Sidewall Direct Vent24Rough Starting, Rough Operation52Sequence of Installations, Figure 18A25Momentary Ignition52Direct Vent Terminal Installation25Not Enough Or No Hot Water52Installation Sequence25Water Is Too Hot52Vent Terminals Supplied with Heater Must be Used25Noisy Operation52Vertical Vent Terminal Installation26Replacement Parts52Concentric Vent Installation27Fault and Alert Conditions52Kit Components27Fault Conditions52Safety Considerations27Alert Conditions52Installation Procedure 1 Roof Termination, see Figure C27Resetting Control System Lock Outs53direct vent diagram30Diagnostic Checks53Vent Pipe Preparation31Fault and Alert Messages54Primer31notes56Primer and Cement31Limited Warranty59Размер: 7,2 МБСтраницы: 60Язык: EnglishПросмотреть