Руководство По Установке для Cisco Cisco 4402 Wireless LAN Controller

Скачать
Страница из 20
7
 
Figure 3
Inserting the VPN Termination Module
Step 5
Gently but firmly press the VPN termination module 
into the slot until it is firmly seated in the card electrical 
connector. Use the provided captive screws to secure 
the VPN termination module to the wireless LAN 
controller. Tighten the screws to 4.5–5.5 in. lb.
Step 6
Restore all power to restart the wireless LAN controller 
(Figure 4).
a.
Insert power cord into controller. If the controller has 
two power modules, insert both power cords.
b.
Close the latch.
c.
Turn controller on.
Figure 4
Restoring Power
146193
146194
C
A
B