Справочник Пользователя для Iveco S30 ENT M23
installation directiVe
6
MAY 2006
S30 ENT M23
15. PREPARING THE ENGINE
FOR FIRST START-UP
1. Drain the residual 30/M protective oil from the sump.
2. Pour into the lubricating loop only lubricating oil of the
2. Pour into the lubricating loop only lubricating oil of the
type and in the quantities set out in the Refilling Table.
3. Drain the CFB protective liquid from the fuel loop,
completing the operations as indicated under item 3. of
Chapter 21.
4. Remove the caps and/or seals from the engine intake,
exhaust, aeration and venting ports, restoring normal
conditions of use. Connect the inlet of the turbocharger
to the air filter.
5. Connect the fuel loops to the boat tank, completing
the operations set out in item 4. of Chapter 21. During
filling operations, connect the pipe returning fuel to the
tank to a collecting container, to prevent residues of CFB
protective liquid from ending up into the boat tank.
6. Verify and refill engine coolant as prescribed.
7. Remove from the engine the labels with the inscription
7. Remove from the engine the labels with the inscription
“ENGINE WITHOUT OIL”.
Although they are extremely important, “common sense”
checks such as the exposure of sensitive parts (plastics, wire
harness, electronic units, etc...) to heat, and those that for
years have characterized the quality of the work performed
in the yard, are not mentioned herein.
Tests of the proper operation of the engine and the com-
ponents of the electronic control system may be performed
rapidly and with the utmost reliability using specific diagnostic
tools, available from IVECO MOTORS Technical Assistance
Centers.
Fuel tank suction
Verify the fuel suction at the maximum allowed longitudinal
and transverse inclination, with the residual quantity of fuel
considered “RESERVE”, such as to cause the reserve indica-
tor light to be permanently lighted.
Throttle lever position sensor
In the positions of minimum and maximum travel, verify the
correlation between the position of the throttle control valve
on the bridge and the position of the sensor rod, checking:
Instrument panel
Verify the efficiency of all light indicators, as described in the
related Chapters.
16. TESTS BEFORE
THE FIRST START-UP