Upon  restoration  of  utility  source  voltage  above  a 
preset level, generator circuit board action signals the 
transfer switch to transfer loads back to that power 
supply. After retransfer, the engine is signalled to shut 
down.
The  actual  sequence  of  operation  is  controlled  by 
sensors and timers on a control logic circuit board, 
as follows:
A. Utility Voltage Dropout Sensor
• This sensor monitors utility source voltage.
• If  utility  source  voltage  drops  below  about  60 
percent of the nominal supply voltage, the sensor 
energizes a 15-second timer.
• Once the timer has expired, the engine will crank 
and start.
B. Engine Warm-up Time Delay
• This  mechanism  lets  the  engine  warm  up  for 
about 10 seconds before the load is transferred 
to a standby source.
C. Standby Voltage Sensor 
• This  sensor  monitors  generator  AC  output  volt-
age. When the voltage has reached 50 percent of 
the  nominal  rated  voltage,  transfer  to  standby 
can occur.
D. Utility Voltage Pickup Sensor 
• This  sensor  monitors  utility  power  supply  volt-
age.  When  that  voltage  is  restored  to  above  70 
percent of the nominal source voltage, a retrans-
fer time delay starts timing.
E. Retransfer Time Delay 
• This timer runs for about 15 seconds.
• At end of a 15-second delay, circuit board action 
de-energizes  the  transfer  relay  in  the  transfer 
switch.
• Retransfer to utility power source then occurs.
F. Engine Cool-down Timer
• When the load is transferred back to utility power 
source,  the  engine  cool-down  timer  starts  tim-
ing.
• The timer will run for about one minute, and the 
generator will then shut down.
3.5  MANUAL TRANSFER OPERATION
3.5.1   TRANSFER TO GENERATOR 
POWER SOURCE
To start the generator and activate the transfer switch 
manually, proceed as follows:
1.  Set  the  generator’s  main  circuit  breaker  to  its 
OFF (or open) position.
2.  Set  the  generator’s  AUTO/OFF/MANUAL  switch 
to OFF.
3.  Turn OFF the utility power supply to the transfer 
switch using the means provided (such as a utility 
main line circuit breaker).
DANGER
  Do not attempt to activate the transfer switch 
manually until all power voltage supplies to the 
switch have been positively turned off. Failure 
to turn off all power voltage supplies may result 
in extremely hazardous and possibly fatal elec-
trical shock.
4.  Use the manual transfer handle inside the trans-
fer  switch  to  move  the  main  contacts  to  their 
“Standby”  position,  i.e.,  loads  connected  to  the 
standby power source (Figure 3.2).
5.  To crank and start the engine, set the AUTO/OFF/
MANUAL switch to MANUAL.
6.  Let  the  engine  stabilize  and  warm  up  for  a  few 
minutes.
7.  Set the generator’s main circuit breaker to its ON 
(or  closed)  position.  The  standby  power  source 
now powers the loads.
Figure 3.2 – Manual Transfer Switch Operation
 3.5.2   TRANSFER BACK TO UTILITY POWER 
SOURCE
When utility power has been restored, transfer back 
to that source and shut down the generator. This can 
be accomplished as follows:
1.  Set  the  generator’s  main  circuit  breaker  to  its 
OFF (or open) position.
2.  Let the engine run for a minute or two at no-load 
to stabilize the internal temperatures.
3.  Set the generator’s AUTO/OFF/MANUAL switch to 
its  OFF  (or  open)  position.  The  engine  should 
shut down.
4.  Check  that  utility  power  supply  to  the  transfer 
switch is turned OFF.
Section 3 — Operation
Air-cooled 7 kW, 12 kW and 15 kW Generators