Cisco Cisco Agent Desktop 9.0 Installationsanleitung
Cisco CAD Installation Guide
122
August 4, 2014
8. Install CAD services on the secondary server (Side B). The steps are the same
for
more information.
9. Configure CAD on Side B with the CAD Configuration Setup utility. Refer to
for more
information. The fields will already be completed based on the information
you entered while configuring CAD on Side A. Verify this information is correct.
you entered while configuring CAD on Side A. Verify this information is correct.
NOTE: You do not have to complete Unified CCE License
Administration on Side B.
Administration on Side B.
10. Restart both servers.
11. If you also upgraded your Unified ICM verify the registry on the peripheral
for more information.