Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1074 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Figure 54: Loopback Points for Test #799
Table 367: Test #799 Near-End External Loop-Back Test 
Error 
Code
Test 
Result
Description / Recommendation
2100
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2000
ABRT
Timed out while waiting for a response from the circuit pack.
1. Retry the command at 1-minute intervals up to 3 times.
2300
ABRT
The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals up to 3 times.
2301
ABRT
The timer could not be set before sending the downlink message 
necessary to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2316
ABRT
Fiber link is not administered. 
Use add fiber-link to administer the DS1 converter fiber link.
2321
ABRT
DS1 facility is not busied out. 
Busyout the DS1 facility via busyout ds1-facility
If there is only one DS1 facility, busyout the DS1 converter circuit 
pack via busyout board.
2332
ABRT
With this system configuration, test is not allowed to execute at the far end 
when there is only one DS1 facility available. Check the green LED at the 
face plate of the DS1 converter circuit pack. The green LED should be on if 
the loop is complete.
 1 of 2
LB 2
LB 1
DS1 Facility
DS1CONV
A
CSU A
Test starts here
CSU B
DS1CONV
B