1714 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Digital Port Loop-Around Test (#13)
This test is a modification of the Voice and Control Channel Local Loop test used by Digital 
Station (DIG-LINE) maintenance. This test does not perform the control channel and secondary 
information channel loop around tests as described for DIG-LINE, as these data paths do not 
exist for the Maintenance/Test digital port. The primary information channel is tested by first 
looping back the data channel onto the TDM bus, and then sending a digital count from the 
Tone-Clock circuit pack and receiving the same digital count with a general-purpose tone 
detector. A conference test is done next for the primary information channel. This is the same 
test as Conference test (#6).
1004
ABRT
The port has been seized by a valid ISDN-PRI test call. Use list 
isdn-testcall
 to determine which call is using the port (from the M/
T Port column). Wait for the test call to complete as indicated in the Start 
Time
 and Duration fields of the above display, or abort the test call with 
clear isdn-testcall grp#/mem#, where grp#/mem# is determined 
screen the B-channel field list isdn-testcall.
1. Retry the command at 1-minute intervals up to 5 times.
2. If the test continues to abort and the port is idle, escalate the problem.
2000
ABRT
Response to the test request was not received within the allowable time 
period.
2100
ABRT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals up to 5 times.
2. If the test continues to abort, escalate the problem.
Any
FAIL
The NPE of the tested port was found to be transmitting in error. This will 
cause noisy and unreliable connections.
1. If the remaining ports are currently idle (amber LED is off), try to reset 
the circuit pack. Then repeat the test.
2. If the test fails again, replace circuit pack.
PASS
The port is correctly using its allocated time slots. User-reported troubles on 
this port should be investigated using other port tests and by examining 
station, trunk, or external wiring.
Table 633: Test #9 NPE Crosstalk Test  (continued)
Error
Code
Test
Result
Description / Recommendation
 2 of 2