Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
390 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Conference Circuit Test (#7)
This test verifies that the NPE channel for the port being tested can correctly perform the 
conferencing function.
0
NO 
BOARD
The test could not relate the internal ID to the port (no board). This could 
be due to incorrect translations, no board is inserted, an incorrect board is 
inserted, or an insane board is inserted.
1. Verify that the board’s translations are correct. Enter list config
and resolve any problems.
2. If the board was found to be correctly inserted in step 1, enter 
busyout board location
3. Enter reset board location
4. Enter release board location
5. Enter test board location long
This should re-establish the linkage between the internal ID and the 
port. If not, verify that a valid board is inserted.
Table 113: Test #6 NPE Crosstalk Test  (continued)
Error
Code
Test
Result
Description / Recommendation
 4 of 4
Table 114: Test #7 Conference Circuit Test 
Error 
Code
Test
Result
Description / Recommendation
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1000
ABRT
System resources required to run this test are not available. The port may 
be busy with a valid call. This result is also reported for the system’s 
Music-On-Hold port when it is off-hook, which it usually is.
1. Enter display port location to determine the station’s extension. 
Enter status station extension to determine the service state of 
the port. If the port is active, wait until it is idle.
2. Retry the command at 1-minute intervals up to 5 times.
 1 of 3