Avaya 03-300430 User Manual
Communication Manager Maintenance-Object Repair Procedures
530 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
B-side ATM-EI—Critical Reliability
1. Enter status pnc, and ensure that the A-PNC is active.
If not, request a pnc interchange using reset pnc interchange.
2. Enter busyout pnc-standby.
3. Enter list config carrier, and verify that an ATM circuit pack is assigned for the new
3. Enter list config carrier, and verify that an ATM circuit pack is assigned for the new
location. If not, add the ATM circuit pack’s translations.
4. Enter busyout atm pnc n (connection number) b-pnc.
5. Enter change atm pnc n (connection number) and change circuit pack location for the B
5. Enter change atm pnc n (connection number) and change circuit pack location for the B
side.
6. Enter release pnc-standby.
Changing ATM Address of Standby
ATM PNC EI, Critical Reliability
ATM PNC EI, Critical Reliability
1. Enter busy pnc-standby.
2. Enter change atm pnc n (connection number), and change the ATM address for the
2. Enter change atm pnc n (connection number), and change the ATM address for the
standby side.
3. Enter release pnc-standby.
Error Log Entries and Test to Clear Values
Table 169: ATM-EI Error Log Entries
Error
Type
Type
Aux
Data
Data
Associated Test
Alarm
Level
Level
On/Off
Board
Board
Test to Clear Value
0 (
)
0
Any
Any
Any
test board location
2 (
)
None
MIN
ON
0
busyout board
location
WRN
OFF
release board location
)
0
None
WRN
OFF
)
None
MIN
ON
)
None
MIN
ON
257-259
(
Any
Expansion Interface
Control Channel test
(#316)
MAJ
ON
test board location r 2
1 of 3