Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
896 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Port Audit and Update Test (#36)
This test sends port-level translation data from the switch processor to the DS1 Interface circuit 
pack or media module to assure that a trunk’s translations are correct. The port audit operation 
verifies the consistency of the current state of the trunk as kept in the DS1 Interface circuit pack 
or media module and in switch software.
Table 306: Test #36 Port Audit and Update Test 
Error 
Code
Test 
Result
Description / Recommendation
ABRT
Internal system error
1. Retry the command at 1-minute intervals up to 5 times.
1000
ABRT
The port may be busy with a valid call.
1. Enter display port location to determine the trunk group/
member number of the port. Use status trunk to determine the 
service state of the port. If the port is in use, wait until it is idle before 
testing.
2. If the port status is active but the port is idle (no calls), check the error 
log for Error Type #1025. The port may be locked up.
3. If the port status is idle, retry the command at 1-minute intervals up to 5 
times.
1006
ABRT
The test was aborted because the trunk is out of service.
1. Use status trunk to verify that the trunk is out of service.
2. If the trunk is out of service, determine why.
3. To put the trunk back in service, enter release trunk. Retry the test.
2000
ABRT
Response to the test was not received in the allowable time period.
1. Rerun the test at 1-minute intervals up to 5 times.
2100
ABRT
Could not allocate resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL
Test failed due to internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
 1 of 2