Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 174
 
 
Removing and Reinstalling the Optical Modules 
 
Removing and Reinstalling the Optical Modules 
The following optical components can be removed and reinstalled from the node 
optical section. The node may contain one optical transmitter and up to two optical 
receivers. 
 
To Remove or Reinstall the Optical Transmitter 
Complete the following steps to remove or reinstall an optical transmitter from the 
optical section. 
 
    WARNING: 
Laser transmitters disconnected from their optical fiber path emit 
invisible laser radiation which is harmful to the human eye. If viewed 
at close range, the radiation may be of sufficient power to cause 
instantaneous damage to the retina of the eye. Only trained service 
personnel using proper safety precautions and equipment, such as 
protective eyewear, should disconnect and service the laser transmitter 
equipment. 
   
1  Open the node housing. Refer to 
To Open the Node Housing (on page 15). 
2  Remove the AC shunt power directors. 
3  Rotate the fiber management tray out of its stored position. Refer to 
To Unstow 
the Fiber Management Tray (on page 22). 
Note: Using your index finger, pull up on the fiber tray pull-tab lever and rotate 
the fiber management tray to partially expose the optical modules below. 
4  Disconnect the fiber connector from the fiber bulkhead in the fiber management 
tray. 
5  Route the fiber pigtail through the fiber access slot. 
6  Using a flat-blade screwdriver, loosen the two mounting screws to remove the 
optical transmitter. 
GainMaker Optical Transmitter Module 
 
OL-29644-03 
37