Landis+Gyr Technology Inc. ER6R1S4 User Manual

Page of 77
Draft
Landis+Gyr
Chapter 6 - Scheduled Demand Reset 
User Guide
98-1723 Rev AB
69
Endpoint Report for Scheduled Reads with Demand Resets
The Endpoint Report for Scheduled Reads with Demand Resets provides a list of all endpoints 
scheduled for reset and the current status of the reset. 
Following is the procedure for generating the Endpoint Report with Scheduled Demand Resets.
1. Select Operations > Scheduled Reads > RF Residential. The Scheduled Reads window will 
open.
2. Click the Scheduled Demand Reset Status link. The Endpoint Report for Scheduled Reads 
with Demand Resets window will open, shown in Figure 6 - 3.
Figure 6 - 3. Endpoint Report for Scheduled Reads with Demand Reset
The user can filter the report, by selecting a status from the Demand Reset Status drop down list.
The following information is displayed:
User Defined Addressing Group. The report is filtered by User Defined Addressing 
Group.
Number Enlisted. This number indicates the total number of endpoints that are included in 
the demand reset. Only those meters in Normal or Configure status can be enlisted.
Last, Next Reset. This indicates the last time the endpoints were scheduled to be reset, and 
when the next time the endpoints are scheduled to be reset.
Last, Next Command. The last value indicates the last date the command was sent to the 
meter. The next value indicates the next date the reset will be sent to the meter. 
Meter Number. Lists the meter numbers of those endpoints scheduled for rest. Click the 
meter number hyper link to open the Endpoint Information screen.
Reset Status. See Table 6-1, “Demand Reset Status - Legend.” for description of Demand 
Reset Status