Table 1-5 Installation Procedures
Procedure
Reference
1
Perform an initial inspection of the transmitter.
Page 22
2
Fit the correct ac input fuse.
Page 22
3
Select the correct ac input tap.
Page 23
4
Selecting the keying method (AM-voice only)
Page 24
5
Fit the transmitter into an equipment rack.
Page 25
6
Connecting remote facilities
Page 25
7
Connect the chassis stud to the rack or system earth.
Page 26
8
Connect the ac input supply (if applicable).
Page 26
9
Connect the dc input supply (if applicable).
Page 27
10
Connect an antenna.
Page 27
INITIAL INSPECTION OF THE TRANSMITTER
On receipt of the transmitter from PAE, remove all transit packaging and check that there is no transit
damage. If damage is evident, contact PAE immediately and retain the original transit packaging.
The following items should be included with the transmitter:
Item 1.
One copy of the T6T User Guide (this handbook).
Item 2.
An unterminated IEC mains connector.
Item 3.
An unterminated 15-way D-type plug (for use with the rear panel Facilities
connector CN5).
FITTING THE CORRECT AC INPUT FUSE
The mains input fuse F2 is an integral part of the rear panel ac connector (the connector and fuse are
shown in Fig. 1-4 on page 14). The fuse type must be correct for the local mains supply. Check the fuse
fitted conforms to that detailed in Table 1-6.
Table 1-6 Input AC Fuse Rating
Mains Input Supply
Fuse
PAE Part Number
110/120 V
T4A 125 V UL
29C11120102S
220/230/240 V
T4A 250 V IEC 127 HBC
29E01120108S
Section 1
T6T Transmitter User Guide
Page 22