Modifications reserved 
Page 49/57 
OPM_LPS_3UO_30K_40K_0US_V010.doc 
Operating Manual LP 33 Series 30 & 40 kVA 
7.2.5 
Start-up an additional unit in a parallel system 
 
 
Before connecting hazardous voltages, make sure that: 
•  The connection to the electrical system has been performed by qualified personnel; 
•  The equipment frame has been correctly grounded to the main earth
•  Make sure that mains input protection is removed; 
•  All the panels removed to allow the UPS connection have been correctly reinstalled; 
•  The UPS switches Q1 and Q2 are OFF (Pos. 0); 
•  The battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) 
are removed. 
 
This procedure must be performed when the load is supplied by the other units of the UPS system and 
an additional unit must be switched ON and connected to the parallel bus in order to share the load 
with each other. 
 
This unit must be completely switched OFF and not powered. 
 
 
1.  Switch ON the mains power at the input distribution pane on 
this unit. 
As a result the UPS performs a self-test and the LCD will show 
the following screen: 
 
EXECUTING MAINBOARD 
SELF TEST 
00000000000 
SELF TEST OK! 
 
 
 
NOTE ! 
In case the alarm “4410 - Mains bypass out of tolerance” persists, please contact 
your Service Center
. 
 
2. Insert 
the battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) on 
this unit. 
 
3.  Switch ON the output switch Q1 (Pos. I) on this unit. 
 
LP 33          40kVA  P2 
APPLICAT. ON UTILITY 
= 70% 
 
 
Verify, selecting the screen METERING/Udcp and Udcn, that the 
booster voltage has reached about 215 VDC of this unit. 
 
Udcp=215V Udcn=215V 
Ubp=164V  Ubn=164V   F 
Charge level 
=  100% 
Autonomy = 
800min 
 
4.  Switch ON the inverter of this unit entering the screen: 
MENU/COMMAND MENU/INVERTER ON 
 
COMMAND MENU 
INVERTER ON * 
INVERTER OFF 
 
 
When the inverter will be synchronized, the unit will be 
automatically connected with the parallel bus-bar and the 
load will be shared with the other units. 
The main screen of each unit will display: APPLICATION ON UPS 
LP 33          40kVA  P2 
APPLICATION ON UPS 
= 70% 
 
 
END OF PROCEDURE