Regency FG39-LPG ユーザーズマニュアル

ページ / 36
14
Regency FG39 FireGenie Freestanding Gas Stove
Diagram 11: The upper half of the flashing is
installed under the roofing material and not
nailed down until the chimney is installed.
This  allows  for  small  adjustments.
4) Assemble the desired lengths of black pipe
and  elbows necessary to reach from the
appliance  adaptor  up  though  the  Round
Support  Box.  Insure  that  all  pipes  and
elbow  connections  are  in  the  fully  twist-
locked position and sealed.
5) Cut a hole in the roof centred on the small
drilled hole placed in the roof in Step 2. The
hole should be of sufficient size to meet the
minimum requirements for clearance to com-
bustibles of 1-1/4" (32mm) . Slip the flashing
under the shingles (shingles should overlap
half the flashing) as per diagram 11.
Diagram  12
7) Ensure flue is vertical and secure the base
of the flashing to the roof with roofing rails,
slide storm collar over the pipe section and
seal with a mastic.
8) Install the vertical termination cap by twist
locking it.
6) Continue to assemble pipe lengths.
Note: If an offset is necessary in the attic
to  avoid  obstructions,  it  is  impor-
tant  to  support  the  flue  pipe  every
3  feet,  to  avoid  excessive  stress
on  the  elbows,  and  possible  sep-
aration.    Wall  straps  are  available
for  this  purpose.    See  diagram  7.
Galvanized  pipe  and  elbows  may  be  uti-
lized  in  the  attic  as  well  as  above  the
roofline.  The galvanized finish is desirable
above the roofline due to its higher corro-
sion  resistance.
Continue to add pipe sections through the
flashing  until  the  height  of  the  flue  cap
meets  the  minimum  height  requirements
specified in diagram 12 or local codes.  Note
that  for  steep  roof  pitches,  the  vertical
height must be increased.  A poor draft, or
down  drafting  can  result  from  high  wind
conditions near big trees or adjoining roof
lines,  in  these  cases,  increasing  the  flue
height may solve the problem.
    Roof Pitch                  Minimum Flue Height
                                           Feet         Meters
flat to 7/12
2
      0.61
over 7/12 to 8/12
2
0.61
over 8/12 to 9/12
2
0.61
over 9/12 to 10/12
2.5
0.76
over 10/12 to 11/12
3.25
0.99
over 11/12 to 12/12
4
1.22
over 12/12 to 14/12
5
1.52
over 14/12 to 16/12
6
1.83
over 16/12 to 18/12
7
2.13
over 18/12 to 20/12
7.5
2.29
over 20/12 to 21/12
8
2.44
Diagram  10
Diagram  9
Diagram  8
Diagram  7
Diagram  6
DURA-FLUE  VERTICAL
TERMINATION
1) Maintain  the  1-1/4"  (32mm)
clearances  (air  spaces)  to
combustibles  when  pass-
ing through ceilings, walls,
roofs,  enclosures,  attic  rafter,
or  other  nearby  combustible
surfaces. Do not pack air spac-
es  with  insulation.  Check
page 9 for the maximum ver-
tical rise of the fluing system
and the maximum horizontal
offset  limitations.
3) To install the Round Support Box/Wall Thim-
ble in a flat ceiling, cut a 10 inch square hole
in the ceiling centred on the hole drilled in
Step 2. Frame the hole as shown in diagram
10.
INSTALLATION
7) Install the Wall Thimble in the center of the
10" square and attach with wood screws.
8) Slide the decorative wall thimble up to the
wall surface being careful not to scratch
the paint and attach with screws provid-
ed. Apply decorative brass or chrome trim
if desired. See diagram  7.
2) Set the gas appliance in its
desired  location.  Drop  a
plumb  bob  down  from  the
ceiling to the position of the
appliance  flue  exit,  and
mark  the  location  where
the flue will penetrate the
ceiling. Drill a small hole at
his  point.  Next,  drop  a
plumb bob from the roof to
the hole previously drilled
in the ceiling, and mark the
spot where the flue will penetrate the roof.
Determine  if  ceiling  joists,  roof  rafters  or
other framing will obstruct the fluing sys-
tem. You may wish to relocate the appli-
ance or to offset, as shown in diagram 9 to
avoid cutting load bearing members.